Client |
Major Contracter |
Project Description |
Completion Year |
---|---|---|---|
Formosa Chemicals & Fibre Corp. | Radiant Section Tube Revamping Project for SM3 Plant F-201 & F219 Heater | 2021 | |
Cosmo E&C Ltd. | Vessels of solvent recovery unit for HL-T Project | 2021 | |
Paul Wurth IHI Co., Ltd | Material hopper and collective hopper for JFE Kurashiki No.4 BF relining project | 2021 | |
Sing Da Marines Structure Corp. | CSBS Corp. Taiwan | Main Can & Leg Fabrication for Wind Power Transition Piece (4 UnitS) | 2021 |
ChiaHui Power Co., Ltd | SPG Dry Cooling | ACC W-Style Equipment erection | 2021 |
Mitsubishi Hitachi Power Systems, Ltd. | Scrubber Tower for Marin FGD System (9 Units) | 2021 | |
Taiwan VCM Corporation | Vessel Revamping Project (3 Units) | 2020 | |
Seaway Heavy Lifting | Two Barge Outfitting Services NS2353 | 2020 | |
Mitsubishi Hitachi Power Systems, Ltd. | Imabari (11,000TEU C/S x4) Scrubber Tower | 2020 | |
Seaway Heavy Lifting | Grillage Fabrication for Pin Pile and EOS 4001 Barge | 2020 | |
Taiwan Power Company | GeII Taiwan | Datan 8 & 9 Misc. Storage Tank | 2020 |
GEII Taiwan | Taiwan Nikkiso Co., Ltd. | Ammonia & Accumulator Tank Fabrication for Datan 8 & 9 Extension Project | 2020 |
Mitsubishi Hitachi Power Systems, Ltd. | Non Pressure Parts for 20MW Class Biomass Boilers | 2020 | |
China Dragon Steel Corporation | China Ecotek Corp. | SCR Reactor Casing Revamping Project | 2020 |
Sing Da Marines Structure Corp. | CSBS Corp. Taiwan | Main Can & Leg Fabrication for Wind Power Transition Piece (2 UnitS) | 2020 |
Paul Wurth IHI Co., Ltd | Muroran cyclone for Dust Catcher Project | 2020 | |
Taiwan VCM Corporation | Heat Exchangers Fabrication | 2020 | |
ChiaHui Power Co., Ltd | SPG Dry Cooling | Manifolds and Condensate Tank Fabrication | 2020 |
Taiwan Power Company No.3 Nuclear Power Plants | Framatoma Gmbh | Supply of Ventruri Scrubber Vessel for NPP3 Power Plant (Maanshan 1+2 Site) | 2020 |
Chang chun Petrochemical Co., Ltd | Stainless steel Heat Exchanger Fabrication | 2020 | |
Mitsubishi Hitachi Power Systems, Ltd. | Scrubber Tower for Marin FGD System (12 Units) | 2020 | |
Allied Supreme Corp. | Stainless Steel Filtration Equipment Fabrication | 2020 | |
CSBS Corp. Taiwan | Piping Spool Fabrication | 2020 | |
CSBS Corp. Taiwan | Container Lashing Bridge Fabrication | 2020 | |
Fuel Cell Energy, Inc. | Enclosure & Outer base fabrication & Assembly (12 sets) | 2020 | |
Huntsman (Taiwan) Ltd. | King PolyTechnic Engineering Co., Ltd. | API Storge Tank Fabrication and Installation | 2019 |
Allied Supreme Corp. | Stainless Steel Equipment Fabrication | 2019 | |
Mitsubishi Hitachi Power Systems, Ltd. | GGH Reheater Casing and Outlet Duct for Thermal Power Plant Project in Japan | 2019 | |
Mitsubishi Hitachi Power Systems, Ltd. | Scrubber Tower for Marin FGD System (12 Units) | 2019 | |
Orient Union Chemical Corp. | Heat Exchander (Clad Steel) Fabrication for EG Plant | 2019 | |
Fuel Cell Energy, Inc. | End Plate fabrication & Assembly (10 sets) | 2019 | |
Chinese Petroleum Corp. | CAIYIN Co., Ltd | Adsorber Vessel fabrication (6 sets) | 2019 |
Formosa Chemicals & Fibre Corp. | Convention Section of Reformer and Stack Revamping Works for Aroma Plant | 2019 | |
Formosa Petrochemical Corp. | G-Watt Co., Ltd. | CDU#1 & CDU#2 APH Revamping Project | 2019 |
Formosa Chemicals & Fibre Corp. | Convention Section, Radiant Section Tube and Connection Duct Revamping Works for Aroma Plant | 2019 | |
Chang chun Petrochemical Co., Ltd | Big Size Columns(304SS) Fabrication and Site Construction | 2019 | |
Lee Chang Yung Chemical Industry Corp. | IPA Reactor (Clad Steel) Fabrication | 2019 | |
Taiwan VCM Corporation | 1200Ton Tank Construction | 2019 | |
China Dragon Steel Corporation | Maintenance work in job site | 2018 | |
Fuel Cell Energy, Inc. | Enclosure & Outer base fabrication & Assembly (4 sets) | 2018 | |
Allied Supreme Corp. | Stainless Steel Equipment Fabrication | 2018 | |
Taiwan Power Company | The Babcock & Wilcox Company (B&W) | Rear Wall & Front Wall of OFA Duct for Talin project (Package 1 & 2) | 2018 |
Taiwan VCM Corporation | Structure Modification for Waste Liquid IncineratorIn System | 2018 | |
Chi Mei Corporation | Heat Exchanger Fabrication & Erection | 2018 | |
Linde LienHwa Industrial Gases Corp. | Linde AG | Cooler, Duct, Molecular Sieve, Pipinf & Pump etc. Modularization Work (Incl. Insulation) | 2018 |
Taiwan VCM Corporation | V-610X Tower Revamping Project | 2018 | |
Taiwan Prosperity Chemical Corp. | E-1X09 & E-1X06A Exchangers Fabrication | 2018 | |
Nippon Steel & Sumikin Plant Designing Corp.. | Daikure Taiwan Co., Ltd. | Casing Fabrication for Heat Recovery System | 2018 |
IDEMITSU FORMOSA SPECIALITY CHEMICALS | John Zink Company, LCC | Thermal Oxidizer Package Fabrication & Installation | 2018 |
Taiwan Plastics Corporation | Formosa Heavy Industry Corp. | Absorber Tower Fabrication and Erection for FGD | 2018 |
P.T. Asahimas Chemical(Indonesia) | Formosa Heavy Industry Corp. | Non Pressure Parts &Tanks Fabrication, Piping System, Boiler, Turbine and auxiliary Equipment Installation, Insulation works and Installation of Machanical, Electrical & Insumment for Whole Plant | 2018 |
2017 | |||
2017 | |||
2017 | |||
TSRC Corp. | Interior Bundle Revamping for Reactor | 2017 | |
Taiwan VCM Corporation | V-620XA/B Pressure Vessel Fabrication (with Jacket) | 2017 | |
Taiwan VCM Corporation | F-6205A/B Pressure Vessel Fabrication (with Jacket) | 2017 | |
Taiwan Plastics Corporation | Drum Fabrication for USA Project (Texas, USA)(with OMEGA Steam Panel) | 2017 | |
Cheng Loong Corp. | CTCI Corp. | SCR System Equipment Fabrication and Erection for CO-Gen. Boiler | 2017 |
Taiwan VCM Corporation | F-620X Crack Furnace Revamping & Construction Project | 2017 | |
The Envoy Enterprise Co., Ltd. | PR-02 Reactor (w/ Heating Coil) Fabrication, Installation and Instrument & Piping EPC Project | 2017 | |
Mitsubishi Hitachi Power Systems, Ltd. | Yamashita International Enterprise Co., Ltd | GT Air Intake Filter System for Fukushima IGCC Nakoso Power Plant [x 1set] | 2017 |
Taiwan VCM Corporation | F-6801/02 Incinerator System modification Work | 2017 | |
IDEMITSU FORMOSA SPECIALITY CHEMICALS | G-Watt Co., Ltd. | 2017 | |
Mitsubishi Hitachi Power Systems, Ltd. | FGD Reheater Casing for Hitachinaka Kyodo Thermal Power Plant Project in Japan | 2017 | |
China Steel Chemical Corp. | Tube Bundle Fabrication ( Material: C276) | 2017 | |
Taiwan VCM Corporation | Heat Exchanger Fabrication | 2017 | |
China Dragon Steel Corporation | Maintenance work in job site | 2017 | |
TSRC Corp. | Interior Bundle Revamping for Reactor | 2017 | |
Taiwan Plastics Corporation | GC-61X Dryer Column Fabrication (Texas, USA) | 2017 | |
Taiwan Plastics Corporation | GC-610 Dryer Column Fabrication (Texas, USA) | 2017 | |
Formosa Chemicals & Fibre Corp. | Eastern Rainbow Engineering Co., Ltd. | Knock-Out Drum & Seal Drum Fabrication | 2017 |
Taiwan VCM Corporation | Pressure Vessels Fabrication | 2017 | |
IDEMITSU FORMOSA SPECIALITY CHEMICALS | G-Watt Co., Ltd. | HHCR Hot Oil Heater Fabrication and Erection | 2017 |
Chi Mei Corporation | Reactor Modification Work | 2017 | |
Chinese Petroleum Corp. | F-1102/F1108 Radiant Section Tube Revamping Project for Linyuan Petrochemical Plant | 2017 | |
Taiwan Plastics Corporation | Convention Section Revamping Works for MR-40X Crack Furnace at RenWu Plant | 2017 | |
Taiwan Plastics Corporation | Convention Section Revamping Works for MR-401A Crack Furnace at RenWu Plant | 2017 | |
UPC Technology Corporation | Pressure Vessels (Clad Steel) & Heat Exchanger Fabrication | 2017 | |
China Steel Chemical Corp. | Heat Exchanger Fabrication (25 Units) | 2017 | |
Shiny Chemical Industrial Co., Ltd. | Drum Fabrication and Erection (9 Units) | 2017 | |
Taiwan Power Company No.3 Nuclear Power Plants | Wash Equipment for Steam System (Skid Module) | 2017 | |
Formosa Petrochemical Corp. | G-Watt Co., Ltd. | CDU#3 APH Revamping Project | 2017 |
CoreMax Corporation | Detail Design for Sulfuric Nickel Line 3 | 2016 | |
CSBC Corporation, Taiwan | Block Assembly & Welding for Semi- submersible heavy lift ship | 2016 | |
Taiwan Plastics Corporation | Waste Heat Bolier (Tube Type) | 2016 | |
CSBC Corporation, Taiwan | BlockAssembly & Welding for Semi- submersible heavy lift ship | 2016 | |
Chinese Petroleum Corp. | Mascol Engineering Co., Ltd. | SCR, AIG, Steam Heater, Duct & Supports Fabrication | 2016 |
Taiwan VCM Corporation | F-620X Crack Furnace Revamping & Construction Project | 2016 | |
CSBC Corporation, Taiwan | Accessories, Piping, Electrical and Instrument Installation for Block Acess Tunnel | 2016 | |
Shin Foong Chemical Industry Corp. | EPC work for PILOT Project. | 2016 | |
Mitsubishi Hitachi Power Systems, Ltd. | FGD Absorber, Duct & Steel Structure of 112MW Coal Firing Power Plant Project in Japan (HEP) | 2016 | |
Chinese Petroleum Corp. | TMC Engineering & Sales Co., Ltd. | Pressure Vessel Fabrication for Talin No.10 Pure Water Plant | 2016 |
Mitsubishi Hitachi Power Systems, Ltd. | FGD Absorber, Duct & Steel Structure of 110MW Coal Firing Power Plant Project in Japan (KMS) | 2016 | |
CoreMax Corporation | Detail Design for Sulfuric Nickel Line | 2016 | |
Oriental Petrochemical (Taiwan) Co., Ltd | Chu Lei Engineering Co., Ltd. | Heat Exchanger & Drum Fabrication for Line 3 MAH Project | 2016 |
Chinese Petroleum Corp. | Pressure Vessel Revamping for Talin No.8 Sulfur Plant | 2016 | |
Mitsubishi Hitachi Power Systems, Ltd. | FGD Absorber, Duct & Steel Structure of 110MW Coal Firing Power Plant Project in Japan (IDI) | 2016 | |
Shin-Etsu Electronics Materials Taiwan | Mitsubishi Kakoki Kaisha, Ltd. | Equipment fabrication for TP Project (Cone Roof Tank x 8sets + Pressure Vessel x 6sets + Heat Exchanger x 2sets) | 2016 |
Taiwan Power Company | CTCI Corp. | SCR & Duct System Fabrication for TPC Talin Power Plant Unit #2 | 2016 |
Nantex Industry Co., Ltd. | Heat Exchanger & Drum Fabrication | 2015 | |
Lee Chang Yung Chemical Industry Corp. | Hank Fah Co., Ltd. | H-40X Heater Revamping | 2015 |
Chinese Petroleum Corp. | CTCI Corp. | F-200X Fired Heater Manufacture | 2015 |
Mitsubishi Hitachi Power Systems, Ltd. | CTCI Corp. | Steel Structure,Absorber & Ducting Fabrication for Philippines PPF3 Project | 2015 |
Orient Union Chemical Corp. | Heat Exchanger, Catalytic Oxidizer + Chloride Removal Vessel Fabrication for CO2-Ⅲ Plant | 2015 | |
Taganito HPAL Nickel Corp. (Philippine) | Eastern Rainbow Engineering Co., Ltd. | H2 Buffle Tank for Taganito HPAL Project (Philippines) | 2015 |
Orient Union Chemical Corp. | Drums Fabrication for CO2-Ⅲ Project (9 Units) | 2015 | |
Yung Chi Paint & Varnish MFG. Co., Ltd. | Supply 6M3 High Speed Separator | 2015 | |
Chunghwa Picture Tubes, Ltd. | Chien Yueh Technology Engineering Co., Ltd. | Piping work & Equipment Installation for ZLD System | 2015 |
MHI Transportation Equipment Engineering & Service Co., Ltd. | Espoir Protechs Corp. | A380 Passenger Boarding Bridge Modification work for Tao Yuan Airport | 2015 |
China Dragon Steel Corporation | Maintenance work in job site | 2015 | |
Fuel Cell Energy, Inc. | Enclosure & Outer base fabrication & Assembly(24 sets) | 2015 | |
Mitsubishi Hitachi Power Systems Eng. Co., Ltd. | Yamashita International Enterprise Co., Ltd | GT Air Intake Filter System for Japan Project | 2015 |
P.T. Asahimas Chemical(Indonesia) | Tsukishima Kankyo Engineering Ltd. | Waste Liquid/Gas Incinerator, Quencher, Emergency Water Receiver and Duct for HCL Recovery Project. | 2015 |
IHI Corp. | Yamashita International Enterprise Co., Ltd. Taipei Branch | Pipe Supports for TPC Talin Project | 2015 |
Boustead International Heater | Hyundai Heavy Industries Co., Ltd. | Supply & Delivery of Fabrication of Steel Work & Waste Heat Recovery Unit (Malaysia) | 2015 |
Taganito HPAL Nickel Corp. (Philippine) | Eastern Rainbow Engineering Co., Ltd. | N2 Storage Tank Fabrication | 2015 |
Fuel Cell Energy | Enclosure & Outer base fabrication & Assembly(75 sets) | 2015 | |
Fuel Cell Energy | Enclosure & Outer base fabrication & Assembly(21 sets) | 2015 | |
Orient Union Chemical Corp. | Heat Exchangers 4 Units Fabrication | 2014 | |
Fuel Cell Energy, Inc. | Enclosure & Outer base fabrication & Assembly (49 sets) | 2014 | |
Taiwan Power Company | CTCI Corp. | Deminralized Water Treatment System for TPC Talin Power Plant Renewal EPC Project | 2014 |
Taiwan Power Company | CTCI Corp. | SCR & Duct System Fabrication for TPC Talin Power Plant Unit #1 | 2014 |
Taiwan Power Company | ALSTOM Taiwan Ltd. | Piping Material & Pre-fab Support for TPC Linkou Power Plant, FF & SWFGD Project | 2014 |
Taiwan Power Company | Sumitomo Corporation | Chemical Feed Tank for Talin Power Plant Renewal Project | 2014 |
Petrofac Saudi Arabia Co., Ltd. | Tsukishima Kankyo Engineering Ltd. | Steel Duct for Petro Rabigh’s II Petrochemical Expansion Plant | 2014 |
Sumitomo Heavy Industries | Jade Yachts Inc. | Girder Post & Boom of Coal Ship Unloader Pre-fabrication | 2014 |
Kaohsiung Monomer Company | E2/91X Convection Bundle Fabrication | 2014 | |
Kaohsiung Monomer Company | E2/911 Convection Bundle Fabrication | 2014 | |
DuPont Taiwan Limited | Process Water Tank Fabrication | 2014 | |
China Steel Chemical Corp. | Heat Exchanger Fabrication (5 sets) for NA Benzene Recovery Project | 2014 | |
Orient Union Chemical Corp. | E2-102N,E2-109,E2-205N,E2-403 Heat Exchangers Fabrication | 2014 | |
Taiwan Prosperity Chemical Corp. | 32X-CB Heat Exchangers Fabrication | 2014 | |
Taiwan Prosperity Chemical Corp. | 321-CB Heat Exchangers Fabrication | 2014 | |
Barrick Gold of Australia Limited | CST Tanks Shell Plate & Structural Steel (Channel) Supply(FOB Kaohsiung port) | 2014 | |
Lee Chang Yung Chemical Industry Corp. | Hank Fah Co., Ltd. | 1000 KL Sphere Tank Construction | 2014 |
Tanjung Bin Energy | Alstom Technical Services (Shanghai) | Alloy Turning Vane Fabrication for Malaysia Power Plan | 2014 |
Lee Chang Yung Chemical Industry Corp. | Hank Fah Co., Ltd. | Acrylonitrile Sphere Tank Construction (1000KL x 1 set) | 2013 |
Formosa Petrochemical Corp. | C5 Sphere Tank Construction (4000KL x 5 sets) | 2013 | |
Taiwan Power Company | Vestech Taiwan Corp. | Simulated Training Wind Tower Fabrication & Transportation for TPC Linkou Training Center | 2013 |
Chinese Petroleum Corp. | CTCI Corp. | S & T Heat Exchanger Fabrication for CPC No.10 Sulfur Plant | 2013 |
China Dragon Steel Corporation | Maintenance work in job site | 2013 | |
Oriental Petrochemical Corp. | Chu Lei Engineering Co., Ltd. | Hydrolysis Equipment Fabrication | 2013 |
China Steel Corp. | King PolyTechnic Engineering Co., Ltd. | SCR Equipment Fabrication for CSC #6 Boiler unit | 2013 |
CPC Corp., Taiwan | CTCI Corp. | S & T Heat Exchanger Fabrication for CPC No.10 Sulfur Plant | 2013 |
Formosa Petrochemical Corp. | C5 Sphere Tank Construcation (4000KL x 5 sets) | 2013 | |
Yuan Long Stainless Steel Corporation | BA2 Spare Muffle Revamping (Material: Inconel 600) | 2013 | |
Formosa Petrochemical Corp. | Formosa Heavy Industry Corp. | Pressure Vessel and Heat Exchanger Fabrication for C5 Project | 2012 |
Chinese Petroleum Corp. | Mascol Engineering Co., Ltd. | Air & Flue Gas Duct Fabrication for BO4 Boiler of CPC Talin Plant | 2012 |
China Man-made Fiber Corp. | Fu-Tai Engineering Co., Ltd. | Tower & Heat Exchanger Fabrication (3 sets) | 2012 |
Dragon Steel Corp. | G-IN Mechanical Eng. Co., Ltd. | CDQ Piping Fabrication Project for China Dragon Steel (PP Stamp) | 2012 |
FHI / Hwa Ya Power Corp. | CTCI Corp. | SCR Reactor Fabrication, Installation and Piping Work | 2012 |
Jinzhou Technology Co., Ltd | Cheng Chen Machinery Co., Ltd | Coal Bunker of Boiler fabrication & Erection Project (3 sets) | 2012 |
Nan Ya Plastics Corp. | Flare System Revamping Project | 2012 | |
Chang chun Plastics Co., Ltd | R-111B Alkylation Reactor Fabrication | 2012 | |
Formosa Petrochemical Corp. | Formosa Heavy Industry Corp. | Ladle Turret Assembly & Welding Work | 2011 |
Mitsubishi Heavy Industries | Yamashita International Enterprise Co., Ltd. | GT AIR Intake Filter System For K #5 Project (CIF Japan) | 2011 |
Mitsubishi Heavy Industries | Yamashita International Enterprise Co., Ltd. | GT AIR Intake Filter System For Singapore Project | 2011 |
Taiwan Prosperity Chemical Corp. | King PolyTechnic Engineering Co., Ltd. | E110X Heat Exchanger Fabrication | 2011 |
Chinese Petroleum Corp. | Ling Chin Co., Ltd. | SCR Catalyst Revamping Project for CPC Kaohsiung Refinery #23 & #24 Boiler Unit | 2011 |
Powertech Energy Corp. | Pall Filtration Pte Ltd. | Filter Tank & Piping Prefabrication Project | 2011 |
China Dragon Steel Corporation | Maintenance work in job site | 2011 | |
CTCI Corp. | Ke-Burgmann EJS | M8666 Expansion Joint Assembly and Welding for CPC RFCC Project | 2011 |
Dragon Steel Corp. | CTCI Corp. | DeNOx Reactor, Chamber, and Support Steel Fabrication for Phase Ⅱ Sinter Plant | 2011 |
Dragon Steel Corp. | CTCI Corp. | DeSox Plate Work for Phase Ⅱ Sinter Plant | 2011 |
CPC Corp., Taiwan | CTCI Corp. | Drum Fabrication for CPC NC 6 Project | 2011 |
Chinese Petroleum Corp. | CTCI Corp. | Crack Furnace Construction for CPC NC 6 Project | 2011 |
CPC Corp., Taiwan | CTCI Corp. | Alloy 20 Tower Fabrication for Aklylation Project | 2011 |
Petronet LNG Limited | CTCT Overseas Corp.Ltd | Stack and Support Steel fabrication for LNG Project | 2011 |
CPC Corp., Taiwan | Aicello Taiwan Co., Ltd | M-6116 Filter Tank and Pure Water Tank Fabrication Project | 2011 |
Oriental Petrochemical Corp. | Chu Lei Engineering Co., Ltd | Equipment Fabrication for T9 Distilled water Tower revamping project | 2011 |
Fuel Cell Energy | Enclosure & Outer base fabrication & Assembly (24 sets) | 2011 | |
China Dragon Steel Corporation | Maintenance work in job site | 2011 | |
Chang chun Plastics Co., Ltd | Heat Exchanger Fabrication for CM2 Project | 2011 | |
Grand Pacific Petrochemical Corporation | V-10X C/D BD Surge Tank Fabrication & Erection Project | 2011 | |
Grand Pacific Petrochemical Corporation | V-103 C/D BD Surge Tank Fabrication & Erection Project | 2011 | |
Kaohsiung Monomer Company | T2-020 A/B Fabrication & Erection Project | 2011 | |
Pan-America Hyperbarics, Inc. | PHA-S1 Hyperbarics Oxygen Chamber Fabrication (30 set) | 2011 | |
Mitsubishi Heavy Industries | Yamashita International Enterprise Co., Ltd. | GT AIR Intake Filter System For Uzbekistan Project | 2010 |
Mitsubishi Heavy Industries | Yamashita International Enterprise Co., Ltd. | GT AIR Intake Filter System For S. K and K #6 Project (CIF Japan) | 2010 |
Chinese Petroleum Corp. | CTCI Corp. | SCR Reactor Fabrication for RFCC Project | 2010 |
CTCI Corp. | Shing Chung Hong Co., Ltd. | Filter Fabrication and for VCM Project | 2010 |
LCY Technology Corp. | Hank Fah Co., Ltd. | Vessels with Jacket V-1502A/B Fabrication for TPSI Project (SA240TP304) | 2010 |
CPC Corp., Taiwan | CTCI Corp. | Back Wash Filter System (Skid Module) for CPC HDS Project | 2010 |
CPC Corp., Taiwan | CTCI Corp. | Drum Fabrication for CPC RFCC Project | 2010 |
CTCI Corp. | Eastern Rainbow Engineering Co., Ltd. | Separator, Condenser and Stack Fabrication for AN & MMA Plant, Thailand | 2010 |
CTCI Corp. | Shing Chung Hong Co., Ltd. | Filter Fabrication and Piping work for CPC RFCC Project | 2010 |
Taiwan Fertilizer Co., Ltd | King PolyTechnic Engineering Co., Ltd. | Heat Exchangers (3 Sets) for Taichung 500mtpd Nitric Acid Plant | 2010 |
PTT Asahi Chemical Co., Ltd | CTCT Overseas Corp.Ltd | SCR Reactor, AIG & Mizer fabricaion for AN & MMA Project | 2010 |
Dragon Steel Corp. | CTCI Corp. | SCR/EP Plate work Fabrication for Phase Ⅱ Sinter Plant | 2010 |
Dragon Steel Corp. | CTCI Corp. | Waste Heat Recovery Boiler Erection for Phase Ⅱ Sinter Plant | 2010 |
CTCI Corp. | Pall Filtration Pte Ltd. | Slurry Oil System Fabrication (Skid Module) for CPC RFCC Project | 2010 |
Pan-America Hyperbarics, Inc. | PHA-S1 Hyperbarics Oxygen Chamber Fabrication (20 set) | 2010 | |
Orient Union Chemical Corp. | E-20XN Heat Exchanger Fabrication | 2010 | |
Orient Union Chemical Corp. | E-206N Fabrication | 2010 | |
Taiwan Polysilicon Corp. | Hank Fah Co., Ltd. | Vessels with Jacket V-150XA/B Fabrication for TPSI Project (SA240TP304) | 2009 |
Taiwan Polysilicon Corp. | Hank Fah Co., Ltd. | Vessels & Heat Exchanger Fabrication for TPSI Project | 2009 |
Mitsubishi Heavy Industries | Yamashita International Enterprise Co., Ltd. | GT AIR Intake Filter System For Russia Project | 2009 |
Mitsubishi Heavy Industries | Yamashita International Enterprise Co., Ltd. | GT AIR Intake Filter System For Turkey Project | 2009 |
Nan Ya Plastics Corp. | Eastern Rainbow Engineering Co.,Ltd. | Waste Liquid/ Waste Gas Incinerator Fabrication for MGN Plant | 2009 |
Lee Chang Yung Chemical Industry Corp. | Hank Fah Co., Ltd. | E-320X Tube Fabrication for Kaohsiung Plant (SUS 307L TUBE) | 2009 |
Lee Chang Yung Chemical Industry Corp. | Hank Fah Co., Ltd. | E-3205 Tube Fabrication for Laohsiung Plant (SUS 317L TUBE) | 2009 |
Mitsubishi Heavy Industries | Yamashita International Enterprise Co., Ltd | GT AIR Intake Filter System For Power Plant (6sets) | 2009 |
Pan-America Hyperbarics, Inc. | PHA-S1 Hyperbarics Oxygen Chamber Fabrication (20 set) | 2009 | |
Dragon Steel Corp. | Piping Works for Raw Material Conveying System | 2009 | |
Dragon Steel Corp. | Phase I Coke Oven Gas Holder & Storage Tanks Fabrication & Erection | 2009 | |
Taiwan Fertilizer Co., Ltd. | Niter III Process R101 Transfer Skirt Fabrication | 2009 | |
Tingyi (Cayman Islands) Holding Corp. | Formosa Heavy Industries Corp. | SRM-MAST(24M) Fabrication for China project | 2008 |
Lee Chang Yung Chemical Industry Corp. | Hank Fah Co., Ltd. | Heat Exchanger Fabrication for Hsiao-Kang Plant | 2008 |
Chinese Petroleum Corp. | Yung Loong Engineering Corp. | Strainer Fabrication from Changhwa Distribution Station to Star Energy Power Plant (34"-600#, w/ U Stamp) | 2008 |
Chinese Petroleum Corp. | Yung Loong Engineering Corp. | In-Line Silencer fabrication for Star Energy Power Plant (34"-600#, w/ U Stamp) | 2008 |
Dragon Steel Corp. | CTCI Corp. | Sinter Plant EP, DeSOx & Support Structure Fabrication for phase Ⅰ | 2008 |
Dragon Steel Corp. | CTCI Corp. | DeNox Reactor, Support Structure & Equipment Fabrication for phase | 2008 |
The Babcock & Wilcox Company (B & W) | CTCI Corp. | SCR Reactor Casing, Duct & Support Structure Fabrication for Sandow Power Plant, Texas, USA | 2008 |
Dragon Steel Corp. | CTCI Corp. | Sinter Plant EP Fabrication for Phase Ⅰ | 2008 |
Taiwan Prosperity Chemical Corp. | Eastern Rainbow Engineering Co.,Ltd. | Waste Liquid Incinerator Body Fabrication & Erection | 2008 |
CPC Corp., Taiwan | Mascol Engineering Co.,LTD. | Vessel, Drum & Heat Exchanger Fabrication for #4 Sulfur Plant | 2008 |
Pan-America Hyperbarics, Inc. | PHA-S1 Hyperbarics Oxygen Chamber Fabrication (60 set) | 2008 | |
Dragon Steel Corp. | Equipment Supporting Structure Fabrication & Erection for Raw Material experiment Plant | 2008 | |
CaMau Power Plant, Vietnam | CTCI Corp. | Main Water Pipe (48") Fabrication | 2007 |
Dragon Steel Corp. | CTCI Corp. | Sinter Cooler Fabrication & Pre-Assembly for Phase Ⅰ | 2007 |
Bangchak Petroleum Public, Co., Ltd | CTCI Corp. | Incinerator & Stack Package Fabrication for Bangchak Project | 2007 |
Dragon Steel Corp. | CTCI Corp. | Sinter Machine Fabrication for Phase Ⅰ | 2007 |
Yee Fong Chemical Corp. | CTCI Corp. | DeNox Reactor & Duct Fabrication | 2007 |
Nan Ya Plastics Corp. | Eastern Rainbow Engineering Co.,Ltd. | Incinerator Body Fabrication and Erection for MA Plant | 2007 |
CPC Corp., Taiwan | Mascol Engineering Co.,LTD. | Stack and Support Structure Fabrication for #4 Sulfur Unit | 2007 |
Formosa Petrochemical Corp. | Formosa Heavy Industries Corp. | H9701 Heater Fabrication | 2007 |
Pan-America Hyperbarics, Inc. | PHA-S1 Hyperbarics Oxygen Chamber Fabrication (32 set) | 2007 | |
Taiwan Fertilizer Co., Ltd. | Niter III Process Heat Exchanger Fabrication | 2007 | |
LCY Chemical Industry Corp. | Steel Structure Fabrication and Erection for Copper Sheet Plant | 2007 | |
Taiwan Prosperity Chemical Corp. | 310EA & 3301EC Tower Fabrication | 2007 | |
Pan-America Hyperbarics, Inc. | PHA-S1 Hyperbarics Oxygen Chamber Fabrication (7 set) | 2006 | |
Formosa Petrochemical Corp. | CTCI Corp. | 3F201~204 Heater Fabrication for #6 NC | 2006 |
China Steel Corp. | CTCI Corp. | Phase IV CDQ Boiler installation | 2006 |
Formosa Chemicals & Fiber Corp. | CTCI Corp. | DeNox Equipment Fabrication for AROMA-3 Heater | 2006 |
Formosa Petrochemical Corp. | CTCI Corp. | OL-3 Cooling Tower Piping Work | 2006 |
Nol-Tec System(ASIA) PTE, LTD. | 100 & 50 cu. Ft. Transporter Fabrication (CIF Singapore) | 2006 | |
Formosa Petrochemical Corp. | Glass Tube Revamping for SAR E-6406 Sulfur Cooler | 2006 | |
LCY Chemical Industry Corp. | Acrylonitrile Purification Equipment Fabrication | 2006 | |
China Steel Chemical Corp. | Activated Clay Tower Fabrication | 2006 | |
Paul Wurth International S.A | China Steel Machinery Corp. | BF2 Granulation Tank & Hot water Tank Fabrication for China Steel Corp. | 2005 |
Taiwan Power Company | CTCI Corp. | Equipment Fabrication for DeNox System for #4 Unit of Hsinta Power Plant | 2005 |
Qatar Petroleum and Chemical Corp. | CTCI Corp. | EP2 Cracker Shell, Steel Structure, and Piping Fabrication/td> | 2005 |
IHI Corp. | CTCI Corp. | Anchor Strap Prefabrication for LNG Storage Tank | 2005 |
Orient Union Chemical Corp. | E101C & E401A/B Heat Exchanger Fabrication | 2005 | |
Taiwan Prosperity Chemical Corp. | 3505VA Steel Structure, Granulator & Prill Tower Fabrication and Erection | 2005 | |
Taiwan Prosperity Chemical Corp. | 5108A Evaporator Fabrication | 2005 | |
China Steel Chemical Corp. | E4101 & E4102 Heat Exchanger Fabrication | 2005 | |
Taiwan Power Company | CTCI Corp. | Equipment Fabrication for DeNox System for #3 Unit of Hsinta Power Plant | 2004 |
The Babcock & Wilcox Company (B & W) | CTCI Corp. | DeNox Support Structure Fabrication for Campbell Power Plant-Unit 3 , Michigan, USA | 2004 |
Anton Steinecker Maschinenfabrik Gmbh | Holvrieka Ido B.V. , Netherlands | Beer Brewing Tank Assembly and Installation for Tsingtao Brewery Co., Ltd. | 2004 |
CPC Corp., Taiwan | CTCI Corp. | Heater, Boiler, Duct and Piping Fabrication and Erection for NP Project of Ta Lin Plant | 2003 |
Formosa Chemicals & Fiber Corp. | CTCI Corp. | F201~F204 Heater Fabrication and Erection | 2003 |
China American Petrochemical Co., Ltd | CTCI Corp. | Steel Structure for Storage Silos for #6 PTA Project | 2002 |
The Babcock & Wilcox Company (B & W) | CTCI Corp. | SCR Support Structure Prefabrication for Karn Power Plant, Michigan, USA | 2002 |
Taiwan Power Company | CTCI Corp. | SCR Steel Structure Fabrication for Taichung Power Plant Units 9 & 10 | 2002 |
Babcock-Hitachi K.K | CTCI Corp. | HRSG Erection and Non-Pressure Parts Fabrication and Erection for Kuo Kuang Power Co., Ltd. | 2002 |
The Babcock & Wilcox Company (B & W) | CTCI Corp. | SCR Reactor and Duct Fabrication for Lewis Creek Power Plant-Unit 1 & 2, Texas, USA | 2002 |
The Babcock & Wilcox Company (B & W) | CTCI Corp. | SCR Support Structure Fabrication for Campbell Power Plant-Unit 2 , Michigan, USA | 2002 |
CPC Corp., Taiwan | CTCI Corp. | Cracker Shell Fabrication and Erection for Alkylation Project of TOR | 2002 |
Taiwan Power Company | CTCI Corp. | GGH Inlet Duct Steel Structure Fabrication for Taichung Power Plant Units 1~4 | 2001 |