| Formosa Chemicals & Fibre Corp. |
|
Radiant Section Tube Revamping Project for SM3 Plant F-201 & F219 Heater |
2021 |
| Cosmo E&C Ltd. |
|
Vessels of solvent recovery unit for HL-T Project |
2021 |
| Paul Wurth IHI Co., Ltd |
|
Material hopper and collective hopper for JFE Kurashiki No.4 BF relining project |
2021 |
| Sing Da Marines Structure Corp. |
CSBS Corp. Taiwan |
Main Can & Leg Fabrication for Wind Power Transition Piece (4 UnitS) |
2021 |
| ChiaHui Power Co., Ltd |
SPG Dry Cooling |
ACC W-Style Equipment erection |
2021 |
| Mitsubishi Hitachi Power Systems, Ltd. |
|
Scrubber Tower for Marin FGD System (9 Units) |
2021 |
| Taiwan VCM Corporation |
|
Vessel Revamping Project (3 Units) |
2020 |
| Seaway Heavy Lifting |
|
Two Barge Outfitting Services NS2353 |
2020 |
| Mitsubishi Hitachi Power Systems, Ltd. |
|
Imabari (11,000TEU C/S x4) Scrubber Tower |
2020 |
| Seaway Heavy Lifting |
|
Grillage Fabrication for Pin Pile and EOS 4001 Barge |
2020 |
| Taiwan Power Company |
GeII Taiwan |
Datan 8 & 9 Misc. Storage Tank |
2020 |
| GEII Taiwan |
Taiwan Nikkiso Co., Ltd. |
Ammonia & Accumulator Tank Fabrication for Datan 8 & 9 Extension Project |
2020 |
| Mitsubishi Hitachi Power Systems, Ltd. |
|
Non Pressure Parts for 20MW Class Biomass Boilers |
2020 |
| China Dragon Steel Corporation |
China Ecotek Corp. |
SCR Reactor Casing Revamping Project |
2020 |
| Sing Da Marines Structure Corp. |
CSBS Corp. Taiwan |
Main Can & Leg Fabrication for Wind Power Transition Piece (2 UnitS) |
2020 |
| Paul Wurth IHI Co., Ltd |
|
Muroran cyclone for Dust Catcher Project |
2020 |
| Taiwan VCM Corporation |
|
Heat Exchangers Fabrication |
2020 |
| ChiaHui Power Co., Ltd |
SPG Dry Cooling |
Manifolds and Condensate Tank Fabrication |
2020 |
| Taiwan Power Company No.3 Nuclear Power Plants |
Framatoma Gmbh |
Supply of Ventruri Scrubber Vessel for NPP3 Power Plant (Maanshan 1+2 Site) |
2020 |
| Chang chun Petrochemical Co., Ltd |
|
Stainless steel Heat Exchanger Fabrication |
2020 |
| Mitsubishi Hitachi Power Systems, Ltd. |
|
Scrubber Tower for Marin FGD System (12 Units) |
2020 |
| Allied Supreme Corp. |
|
Stainless Steel Filtration Equipment Fabrication |
2020 |
| CSBS Corp. Taiwan |
|
Piping Spool Fabrication |
2020 |
| CSBS Corp. Taiwan |
|
Container Lashing Bridge Fabrication |
2020 |
| Fuel Cell Energy, Inc. |
|
Enclosure & Outer base fabrication & Assembly (12 sets) |
2020 |
| Huntsman (Taiwan) Ltd. |
King PolyTechnic Engineering Co., Ltd. |
API Storge Tank Fabrication and Installation |
2019 |
| Allied Supreme Corp. |
|
Stainless Steel Equipment Fabrication |
2019 |
| Mitsubishi Hitachi Power Systems, Ltd. |
|
GGH Reheater Casing and Outlet Duct for Thermal Power Plant Project in Japan |
2019 |
| Mitsubishi Hitachi Power Systems, Ltd. |
|
Scrubber Tower for Marin FGD System (12 Units) |
2019 |
| Orient Union Chemical Corp. |
|
Heat Exchander (Clad Steel) Fabrication for EG Plant |
2019 |
| Fuel Cell Energy, Inc. |
|
End Plate fabrication & Assembly (10 sets) |
2019 |
| Chinese Petroleum Corp. |
CAIYIN Co., Ltd |
Adsorber Vessel fabrication (6 sets) |
2019 |
| Formosa Chemicals & Fibre Corp. |
|
Convention Section of Reformer and Stack Revamping Works for Aroma Plant |
2019 |
| Formosa Petrochemical Corp. |
G-Watt Co., Ltd. |
CDU#1 & CDU#2 APH Revamping Project |
2019 |
| Formosa Chemicals & Fibre Corp. |
|
Convention Section, Radiant Section Tube and Connection Duct Revamping Works for Aroma Plant |
2019 |
| Chang chun Petrochemical Co., Ltd |
|
Big Size Columns(304SS) Fabrication and Site Construction |
2019 |
| Lee Chang Yung Chemical Industry Corp. |
|
IPA Reactor (Clad Steel) Fabrication |
2019 |
| Taiwan VCM Corporation |
|
1200Ton Tank Construction |
2019 |
| China Dragon Steel Corporation |
|
Maintenance work in job site |
2018 |
| Fuel Cell Energy, Inc. |
|
Enclosure & Outer base fabrication & Assembly (4 sets) |
2018 |
| Allied Supreme Corp. |
|
Stainless Steel Equipment Fabrication |
2018 |
| Taiwan Power Company |
The Babcock & Wilcox Company (B&W) |
Rear Wall & Front Wall of OFA Duct for Talin project (Package 1 & 2) |
2018 |
| Taiwan VCM Corporation |
|
Structure Modification for Waste Liquid IncineratorIn System |
2018 |
| Chi Mei Corporation |
|
Heat Exchanger Fabrication & Erection |
2018 |
| Linde LienHwa Industrial Gases Corp. |
Linde AG |
Cooler, Duct, Molecular Sieve, Pipinf & Pump etc. Modularization Work (Incl. Insulation) |
2018 |
| Taiwan VCM Corporation |
|
V-610X Tower Revamping Project |
2018 |
| Taiwan Prosperity Chemical Corp. |
|
E-1X09 & E-1X06A Exchangers Fabrication |
2018 |
| Nippon Steel & Sumikin Plant Designing Corp.. |
Daikure Taiwan Co., Ltd. |
Casing Fabrication for Heat Recovery System |
2018 |
| IDEMITSU FORMOSA SPECIALITY CHEMICALS |
John Zink Company, LCC |
Thermal Oxidizer Package Fabrication & Installation |
2018 |
| Taiwan Plastics Corporation |
Formosa Heavy Industry Corp. |
Absorber Tower Fabrication and Erection for FGD |
2018 |
| P.T. Asahimas Chemical(Indonesia) |
Formosa Heavy Industry Corp. |
Non Pressure Parts &Tanks Fabrication, Piping System, Boiler, Turbine and auxiliary Equipment Installation, Insulation works and Installation of Machanical, Electrical & Insumment for Whole Plant |
2018 |
| |
|
|
2017 |
| |
|
|
2017 |
| |
|
|
2017 |
| TSRC Corp. |
|
Interior Bundle Revamping for Reactor |
2017 |
| Taiwan VCM Corporation |
|
V-620XA/B Pressure Vessel Fabrication (with Jacket) |
2017 |
| Taiwan VCM Corporation |
|
F-6205A/B Pressure Vessel Fabrication (with Jacket) |
2017 |
| Taiwan Plastics Corporation |
|
Drum Fabrication for USA Project (Texas, USA)(with OMEGA Steam Panel) |
2017 |
| Cheng Loong Corp. |
CTCI Corp. |
SCR System Equipment Fabrication and Erection for CO-Gen. Boiler |
2017 |
| Taiwan VCM Corporation |
|
F-620X Crack Furnace Revamping & Construction Project |
2017 |
| The Envoy Enterprise Co., Ltd. |
|
PR-02 Reactor (w/ Heating Coil) Fabrication, Installation and Instrument & Piping EPC Project |
2017 |
| Mitsubishi Hitachi Power Systems, Ltd. |
Yamashita International Enterprise Co., Ltd |
GT Air Intake Filter System for Fukushima IGCC Nakoso Power Plant [x 1set] |
2017 |
| Taiwan VCM Corporation |
|
F-6801/02 Incinerator System modification Work |
2017 |
| IDEMITSU FORMOSA SPECIALITY CHEMICALS |
G-Watt Co., Ltd. |
|
2017 |
| Mitsubishi Hitachi Power Systems, Ltd. |
|
FGD Reheater Casing for Hitachinaka Kyodo Thermal Power Plant Project in Japan |
2017 |
| China Steel Chemical Corp. |
|
Tube Bundle Fabrication ( Material: C276) |
2017 |
| Taiwan VCM Corporation |
|
Heat Exchanger Fabrication |
2017 |
| China Dragon Steel Corporation |
|
Maintenance work in job site |
2017 |
| TSRC Corp. |
|
Interior Bundle Revamping for Reactor |
2017 |
| Taiwan Plastics Corporation |
|
GC-61X Dryer Column Fabrication (Texas, USA) |
2017 |
| Taiwan Plastics Corporation |
|
GC-610 Dryer Column Fabrication (Texas, USA) |
2017 |
| Formosa Chemicals & Fibre Corp. |
Eastern Rainbow Engineering Co., Ltd. |
Knock-Out Drum & Seal Drum Fabrication |
2017 |
| Taiwan VCM Corporation |
|
Pressure Vessels Fabrication |
2017 |
| IDEMITSU FORMOSA SPECIALITY CHEMICALS |
G-Watt Co., Ltd. |
HHCR Hot Oil Heater Fabrication and Erection |
2017 |
| Chi Mei Corporation |
|
Reactor Modification Work |
2017 |
| Chinese Petroleum Corp. |
|
F-1102/F1108 Radiant Section Tube Revamping Project for Linyuan Petrochemical Plant |
2017 |
| Taiwan Plastics Corporation |
|
Convention Section Revamping Works for MR-40X Crack Furnace at RenWu Plant |
2017 |
| Taiwan Plastics Corporation |
|
Convention Section Revamping Works for MR-401A Crack Furnace at RenWu Plant |
2017 |
| UPC Technology Corporation |
|
Pressure Vessels (Clad Steel) & Heat Exchanger Fabrication |
2017 |
| China Steel Chemical Corp. |
|
Heat Exchanger Fabrication (25 Units) |
2017 |
| Shiny Chemical Industrial Co., Ltd. |
|
Drum Fabrication and Erection (9 Units) |
2017 |
| Taiwan Power Company No.3 Nuclear Power Plants |
|
Wash Equipment for Steam System (Skid Module) |
2017 |
| Formosa Petrochemical Corp. |
G-Watt Co., Ltd. |
CDU#3 APH Revamping Project |
2017 |
| CoreMax Corporation |
|
Detail Design for Sulfuric Nickel Line 3 |
2016 |
| CSBC Corporation, Taiwan |
|
Block Assembly & Welding for Semi- submersible heavy lift ship |
2016 |
| Taiwan Plastics Corporation |
|
Waste Heat Bolier (Tube Type) |
2016 |
| CSBC Corporation, Taiwan |
|
BlockAssembly & Welding for Semi- submersible heavy lift ship |
2016 |
| Chinese Petroleum Corp. |
Mascol Engineering Co., Ltd. |
SCR, AIG, Steam Heater, Duct & Supports Fabrication |
2016 |
| Taiwan VCM Corporation |
|
F-620X Crack Furnace Revamping & Construction Project |
2016 |
| CSBC Corporation, Taiwan |
|
Accessories, Piping, Electrical and Instrument Installation for Block Acess Tunnel |
2016 |
| Shin Foong Chemical Industry Corp. |
|
EPC work for PILOT Project. |
2016 |
| Mitsubishi Hitachi Power Systems, Ltd. |
|
FGD Absorber, Duct & Steel Structure of 112MW Coal Firing Power Plant Project in Japan (HEP) |
2016 |
| Chinese Petroleum Corp. |
TMC Engineering & Sales Co., Ltd. |
Pressure Vessel Fabrication for Talin No.10 Pure Water Plant |
2016 |
| Mitsubishi Hitachi Power Systems, Ltd. |
|
FGD Absorber, Duct & Steel Structure of 110MW Coal Firing Power Plant Project in Japan (KMS) |
2016 |
| CoreMax Corporation |
|
Detail Design for Sulfuric Nickel Line |
2016 |
| Oriental Petrochemical (Taiwan) Co., Ltd |
Chu Lei Engineering Co., Ltd. |
Heat Exchanger & Drum Fabrication for Line 3 MAH Project |
2016 |
| Chinese Petroleum Corp. |
|
Pressure Vessel Revamping for Talin No.8 Sulfur Plant |
2016 |
| Mitsubishi Hitachi Power Systems, Ltd. |
|
FGD Absorber, Duct & Steel Structure of 110MW Coal Firing Power Plant Project in Japan (IDI) |
2016 |
| Shin-Etsu Electronics Materials Taiwan |
Mitsubishi Kakoki Kaisha, Ltd. |
Equipment fabrication for TP Project (Cone Roof Tank x 8sets + Pressure Vessel x 6sets + Heat Exchanger x 2sets) |
2016 |
| Taiwan Power Company |
CTCI Corp. |
SCR & Duct System Fabrication for TPC Talin Power Plant Unit #2 |
2016 |
| Nantex Industry Co., Ltd. |
|
Heat Exchanger & Drum Fabrication |
2015 |
| Lee Chang Yung Chemical Industry Corp. |
Hank Fah Co., Ltd. |
H-40X Heater Revamping |
2015 |
| Chinese Petroleum Corp. |
CTCI Corp. |
F-200X Fired Heater Manufacture |
2015 |
| Mitsubishi Hitachi Power Systems, Ltd. |
CTCI Corp. |
Steel Structure,Absorber & Ducting Fabrication for Philippines PPF3 Project |
2015 |
| Orient Union Chemical Corp. |
|
Heat Exchanger, Catalytic Oxidizer + Chloride Removal Vessel Fabrication for CO2-Ⅲ Plant |
2015 |
| Taganito HPAL Nickel Corp. (Philippine) |
Eastern Rainbow Engineering Co., Ltd. |
H2 Buffle Tank for Taganito HPAL Project (Philippines) |
2015 |
| Orient Union Chemical Corp. |
|
Drums Fabrication for CO2-Ⅲ Project (9 Units) |
2015 |
| Yung Chi Paint & Varnish MFG. Co., Ltd. |
|
Supply 6M3 High Speed Separator |
2015 |
| Chunghwa Picture Tubes, Ltd. |
Chien Yueh Technology Engineering Co., Ltd. |
Piping work & Equipment Installation for ZLD System |
2015 |
| MHI Transportation Equipment Engineering & Service Co., Ltd. |
Espoir Protechs Corp. |
A380 Passenger Boarding Bridge Modification work for Tao Yuan Airport |
2015 |
| China Dragon Steel Corporation |
|
Maintenance work in job site |
2015 |
| Fuel Cell Energy, Inc. |
|
Enclosure & Outer base fabrication & Assembly(24 sets) |
2015 |
| Mitsubishi Hitachi Power Systems Eng. Co., Ltd. |
Yamashita International Enterprise Co., Ltd |
GT Air Intake Filter System for Japan Project |
2015 |
| P.T. Asahimas Chemical(Indonesia) |
Tsukishima Kankyo Engineering Ltd. |
Waste Liquid/Gas Incinerator, Quencher, Emergency Water Receiver and Duct for HCL Recovery Project. |
2015 |
| IHI Corp. |
Yamashita International Enterprise Co., Ltd. Taipei Branch |
Pipe Supports for TPC Talin Project |
2015 |
| Boustead International Heater |
Hyundai Heavy Industries Co., Ltd. |
Supply & Delivery of Fabrication of Steel Work & Waste Heat Recovery Unit (Malaysia) |
2015 |
| Taganito HPAL Nickel Corp. (Philippine) |
Eastern Rainbow Engineering Co., Ltd. |
N2 Storage Tank Fabrication |
2015 |
| Fuel Cell Energy |
|
Enclosure & Outer base fabrication & Assembly(75 sets) |
2015 |
| Fuel Cell Energy |
|
Enclosure & Outer base fabrication & Assembly(21 sets) |
2015 |
| Orient Union Chemical Corp. |
|
Heat Exchangers 4 Units Fabrication |
2014 |
| Fuel Cell Energy, Inc. |
|
Enclosure & Outer base fabrication & Assembly (49 sets) |
2014 |
| Taiwan Power Company |
CTCI Corp. |
Deminralized Water Treatment System for TPC Talin Power Plant Renewal EPC Project |
2014 |
| Taiwan Power Company |
CTCI Corp. |
SCR & Duct System Fabrication for TPC Talin Power Plant Unit #1 |
2014 |
| Taiwan Power Company |
ALSTOM Taiwan Ltd. |
Piping Material & Pre-fab Support for TPC Linkou Power Plant, FF & SWFGD Project |
2014 |
| Taiwan Power Company |
Sumitomo Corporation |
Chemical Feed Tank for Talin Power Plant Renewal Project |
2014 |
| Petrofac Saudi Arabia Co., Ltd. |
Tsukishima Kankyo Engineering Ltd. |
Steel Duct for Petro Rabigh’s II Petrochemical Expansion Plant |
2014 |
| Sumitomo Heavy Industries |
Jade Yachts Inc. |
Girder Post & Boom of Coal Ship Unloader Pre-fabrication |
2014 |
| Kaohsiung Monomer Company |
|
E2/91X Convection Bundle Fabrication |
2014 |
| Kaohsiung Monomer Company |
|
E2/911 Convection Bundle Fabrication |
2014 |
| DuPont Taiwan Limited |
|
Process Water Tank Fabrication |
2014 |
| China Steel Chemical Corp. |
|
Heat Exchanger Fabrication (5 sets) for NA Benzene Recovery Project |
2014 |
| Orient Union Chemical Corp. |
|
E2-102N,E2-109,E2-205N,E2-403 Heat Exchangers Fabrication |
2014 |
| Taiwan Prosperity Chemical Corp. |
|
32X-CB Heat Exchangers Fabrication |
2014 |
| Taiwan Prosperity Chemical Corp. |
|
321-CB Heat Exchangers Fabrication |
2014 |
| Barrick Gold of Australia Limited |
|
CST Tanks Shell Plate & Structural Steel (Channel) Supply(FOB Kaohsiung port) |
2014 |
| Lee Chang Yung Chemical Industry Corp. |
Hank Fah Co., Ltd. |
1000 KL Sphere Tank Construction |
2014 |
| Tanjung Bin Energy |
Alstom Technical Services (Shanghai) |
Alloy Turning Vane Fabrication for Malaysia Power Plan |
2014 |
| Lee Chang Yung Chemical Industry Corp. |
Hank Fah Co., Ltd. |
Acrylonitrile Sphere Tank Construction (1000KL x 1 set) |
2013 |
| Formosa Petrochemical Corp. |
|
C5 Sphere Tank Construction (4000KL x 5 sets) |
2013 |
| Taiwan Power Company |
Vestech Taiwan Corp. |
Simulated Training Wind Tower Fabrication & Transportation for TPC Linkou Training Center |
2013 |
| Chinese Petroleum Corp. |
CTCI Corp. |
S & T Heat Exchanger Fabrication for CPC No.10 Sulfur Plant |
2013 |
| China Dragon Steel Corporation |
|
Maintenance work in job site |
2013 |
| Oriental Petrochemical Corp. |
Chu Lei Engineering Co., Ltd. |
Hydrolysis Equipment Fabrication |
2013 |
| China Steel Corp. |
King PolyTechnic Engineering Co., Ltd. |
SCR Equipment Fabrication for CSC #6 Boiler unit |
2013 |
| CPC Corp., Taiwan |
CTCI Corp. |
S & T Heat Exchanger Fabrication for CPC No.10 Sulfur Plant |
2013 |
| Formosa Petrochemical Corp. |
|
C5 Sphere Tank Construcation (4000KL x 5 sets) |
2013 |
| Yuan Long Stainless Steel Corporation |
|
BA2 Spare Muffle Revamping (Material: Inconel 600) |
2013 |
| Formosa Petrochemical Corp. |
Formosa Heavy Industry Corp. |
Pressure Vessel and Heat Exchanger Fabrication for C5 Project |
2012 |
| Chinese Petroleum Corp. |
Mascol Engineering Co., Ltd. |
Air & Flue Gas Duct Fabrication for BO4 Boiler of CPC Talin Plant |
2012 |
| China Man-made Fiber Corp. |
Fu-Tai Engineering Co., Ltd. |
Tower & Heat Exchanger Fabrication (3 sets) |
2012 |
| Dragon Steel Corp. |
G-IN Mechanical Eng. Co., Ltd. |
CDQ Piping Fabrication Project for China Dragon Steel (PP Stamp) |
2012 |
| FHI / Hwa Ya Power Corp. |
CTCI Corp. |
SCR Reactor Fabrication, Installation and Piping Work |
2012 |
| Jinzhou Technology Co., Ltd |
Cheng Chen Machinery Co., Ltd |
Coal Bunker of Boiler fabrication & Erection Project (3 sets) |
2012 |
| Nan Ya Plastics Corp. |
|
Flare System Revamping Project |
2012 |
| Chang chun Plastics Co., Ltd |
|
R-111B Alkylation Reactor Fabrication |
2012 |
| Formosa Petrochemical Corp. |
Formosa Heavy Industry Corp. |
Ladle Turret Assembly & Welding Work |
2011 |
| Mitsubishi Heavy Industries |
Yamashita International Enterprise Co., Ltd. |
GT AIR Intake Filter System For K #5 Project (CIF Japan) |
2011 |
| Mitsubishi Heavy Industries |
Yamashita International Enterprise Co., Ltd. |
GT AIR Intake Filter System For Singapore Project |
2011 |
| Taiwan Prosperity Chemical Corp. |
King PolyTechnic Engineering Co., Ltd. |
E110X Heat Exchanger Fabrication |
2011 |
| Chinese Petroleum Corp. |
Ling Chin Co., Ltd. |
SCR Catalyst Revamping Project for CPC Kaohsiung Refinery #23 & #24 Boiler Unit |
2011 |
| Powertech Energy Corp. |
Pall Filtration Pte Ltd. |
Filter Tank & Piping Prefabrication Project |
2011 |
| China Dragon Steel Corporation |
|
Maintenance work in job site |
2011 |
| CTCI Corp. |
Ke-Burgmann EJS |
M8666 Expansion Joint Assembly and Welding for CPC RFCC Project |
2011 |
| Dragon Steel Corp. |
CTCI Corp. |
DeNOx Reactor, Chamber, and Support Steel Fabrication for Phase Ⅱ Sinter Plant |
2011 |
| Dragon Steel Corp. |
CTCI Corp. |
DeSox Plate Work for Phase Ⅱ Sinter Plant |
2011 |
| CPC Corp., Taiwan |
CTCI Corp. |
Drum Fabrication for CPC NC 6 Project |
2011 |
| Chinese Petroleum Corp. |
CTCI Corp. |
Crack Furnace Construction for CPC NC 6 Project |
2011 |
| CPC Corp., Taiwan |
CTCI Corp. |
Alloy 20 Tower Fabrication for Aklylation Project |
2011 |
| Petronet LNG Limited |
CTCT Overseas Corp.Ltd |
Stack and Support Steel fabrication for LNG Project |
2011 |
| CPC Corp., Taiwan |
Aicello Taiwan Co., Ltd |
M-6116 Filter Tank and Pure Water Tank Fabrication Project |
2011 |
| Oriental Petrochemical Corp. |
Chu Lei Engineering Co., Ltd |
Equipment Fabrication for T9 Distilled water Tower revamping project |
2011 |
| Fuel Cell Energy |
|
Enclosure & Outer base fabrication & Assembly (24 sets) |
2011 |
| China Dragon Steel Corporation |
|
Maintenance work in job site |
2011 |
| Chang chun Plastics Co., Ltd |
|
Heat Exchanger Fabrication for CM2 Project |
2011 |
| Grand Pacific Petrochemical Corporation |
|
V-10X C/D BD Surge Tank Fabrication & Erection Project |
2011 |
| Grand Pacific Petrochemical Corporation |
|
V-103 C/D BD Surge Tank Fabrication & Erection Project |
2011 |
| Kaohsiung Monomer Company |
|
T2-020 A/B Fabrication & Erection Project |
2011 |
| Pan-America Hyperbarics, Inc. |
|
PHA-S1 Hyperbarics Oxygen Chamber Fabrication (30 set) |
2011 |
| Mitsubishi Heavy Industries |
Yamashita International Enterprise Co., Ltd. |
GT AIR Intake Filter System For Uzbekistan Project |
2010 |
| Mitsubishi Heavy Industries |
Yamashita International Enterprise Co., Ltd. |
GT AIR Intake Filter System For S. K and K #6 Project (CIF Japan) |
2010 |
| Chinese Petroleum Corp. |
CTCI Corp. |
SCR Reactor Fabrication for RFCC Project |
2010 |
| CTCI Corp. |
Shing Chung Hong Co., Ltd. |
Filter Fabrication and for VCM Project |
2010 |
| LCY Technology Corp. |
Hank Fah Co., Ltd. |
Vessels with Jacket V-1502A/B Fabrication for TPSI Project (SA240TP304) |
2010 |
| CPC Corp., Taiwan |
CTCI Corp. |
Back Wash Filter System (Skid Module) for CPC HDS Project |
2010 |
| CPC Corp., Taiwan |
CTCI Corp. |
Drum Fabrication for CPC RFCC Project |
2010 |
| CTCI Corp. |
Eastern Rainbow Engineering Co., Ltd. |
Separator, Condenser and Stack Fabrication for AN & MMA Plant, Thailand |
2010 |
| CTCI Corp. |
Shing Chung Hong Co., Ltd. |
Filter Fabrication and Piping work for CPC RFCC Project |
2010 |
| Taiwan Fertilizer Co., Ltd |
King PolyTechnic Engineering Co., Ltd. |
Heat Exchangers (3 Sets) for Taichung 500mtpd Nitric Acid Plant |
2010 |
| PTT Asahi Chemical Co., Ltd |
CTCT Overseas Corp.Ltd |
SCR Reactor, AIG & Mizer fabricaion for AN & MMA Project |
2010 |
| Dragon Steel Corp. |
CTCI Corp. |
SCR/EP Plate work Fabrication for Phase Ⅱ Sinter Plant |
2010 |
| Dragon Steel Corp. |
CTCI Corp. |
Waste Heat Recovery Boiler Erection for Phase Ⅱ Sinter Plant |
2010 |
| CTCI Corp. |
Pall Filtration Pte Ltd. |
Slurry Oil System Fabrication (Skid Module) for CPC RFCC Project |
2010 |
| Pan-America Hyperbarics, Inc. |
|
PHA-S1 Hyperbarics Oxygen Chamber Fabrication (20 set) |
2010 |
| Orient Union Chemical Corp. |
|
E-20XN Heat Exchanger Fabrication |
2010 |
| Orient Union Chemical Corp. |
|
E-206N Fabrication |
2010 |
| Taiwan Polysilicon Corp. |
Hank Fah Co., Ltd. |
Vessels with Jacket V-150XA/B Fabrication for TPSI Project (SA240TP304) |
2009 |
| Taiwan Polysilicon Corp. |
Hank Fah Co., Ltd. |
Vessels & Heat Exchanger Fabrication for TPSI Project |
2009 |
| Mitsubishi Heavy Industries |
Yamashita International Enterprise Co., Ltd. |
GT AIR Intake Filter System For Russia Project |
2009 |
| Mitsubishi Heavy Industries |
Yamashita International Enterprise Co., Ltd. |
GT AIR Intake Filter System For Turkey Project |
2009 |
| Nan Ya Plastics Corp. |
Eastern Rainbow Engineering Co.,Ltd. |
Waste Liquid/ Waste Gas Incinerator Fabrication for MGN Plant |
2009 |
| Lee Chang Yung Chemical Industry Corp. |
Hank Fah Co., Ltd. |
E-320X Tube Fabrication for Kaohsiung Plant (SUS 307L TUBE) |
2009 |
| Lee Chang Yung Chemical Industry Corp. |
Hank Fah Co., Ltd. |
E-3205 Tube Fabrication for Laohsiung Plant (SUS 317L TUBE) |
2009 |
| Mitsubishi Heavy Industries |
Yamashita International Enterprise Co., Ltd |
GT AIR Intake Filter System For Power Plant (6sets) |
2009 |
| Pan-America Hyperbarics, Inc. |
|
PHA-S1 Hyperbarics Oxygen Chamber Fabrication (20 set) |
2009 |
| Dragon Steel Corp. |
|
Piping Works for Raw Material Conveying System |
2009 |
| Dragon Steel Corp. |
|
Phase I Coke Oven Gas Holder & Storage Tanks Fabrication & Erection |
2009 |
| Taiwan Fertilizer Co., Ltd. |
|
Niter III Process R101 Transfer Skirt Fabrication |
2009 |
| Tingyi (Cayman Islands) Holding Corp. |
Formosa Heavy Industries Corp. |
SRM-MAST(24M) Fabrication for China project |
2008 |
| Lee Chang Yung Chemical Industry Corp. |
Hank Fah Co., Ltd. |
Heat Exchanger Fabrication for Hsiao-Kang Plant |
2008 |
| Chinese Petroleum Corp. |
Yung Loong Engineering Corp. |
Strainer Fabrication from Changhwa Distribution Station to Star Energy Power Plant (34"-600#, w/ U Stamp) |
2008 |
| Chinese Petroleum Corp. |
Yung Loong Engineering Corp. |
In-Line Silencer fabrication for Star Energy Power Plant (34"-600#, w/ U Stamp) |
2008 |
| Dragon Steel Corp. |
CTCI Corp. |
Sinter Plant EP, DeSOx & Support Structure Fabrication for phase Ⅰ |
2008 |
| Dragon Steel Corp. |
CTCI Corp. |
DeNox Reactor, Support Structure & Equipment Fabrication for phase |
2008 |
| The Babcock & Wilcox Company (B & W) |
CTCI Corp. |
SCR Reactor Casing, Duct & Support Structure Fabrication for Sandow Power Plant, Texas, USA |
2008 |
| Dragon Steel Corp. |
CTCI Corp. |
Sinter Plant EP Fabrication for Phase Ⅰ |
2008 |
| Taiwan Prosperity Chemical Corp. |
Eastern Rainbow Engineering Co.,Ltd. |
Waste Liquid Incinerator Body Fabrication & Erection |
2008 |
| CPC Corp., Taiwan |
Mascol Engineering Co.,LTD. |
Vessel, Drum & Heat Exchanger Fabrication for #4 Sulfur Plant |
2008 |
| Pan-America Hyperbarics, Inc. |
|
PHA-S1 Hyperbarics Oxygen Chamber Fabrication (60 set) |
2008 |
| Dragon Steel Corp. |
|
Equipment Supporting Structure Fabrication & Erection for Raw Material experiment Plant |
2008 |
| CaMau Power Plant, Vietnam |
CTCI Corp. |
Main Water Pipe (48") Fabrication |
2007 |
| Dragon Steel Corp. |
CTCI Corp. |
Sinter Cooler Fabrication & Pre-Assembly for Phase Ⅰ |
2007 |
| Bangchak Petroleum Public, Co., Ltd |
CTCI Corp. |
Incinerator & Stack Package Fabrication for Bangchak Project |
2007 |
| Dragon Steel Corp. |
CTCI Corp. |
Sinter Machine Fabrication for Phase Ⅰ |
2007 |
| Yee Fong Chemical Corp. |
CTCI Corp. |
DeNox Reactor & Duct Fabrication |
2007 |
| Nan Ya Plastics Corp. |
Eastern Rainbow Engineering Co.,Ltd. |
Incinerator Body Fabrication and Erection for MA Plant |
2007 |
| CPC Corp., Taiwan |
Mascol Engineering Co.,LTD. |
Stack and Support Structure Fabrication for #4 Sulfur Unit |
2007 |
| Formosa Petrochemical Corp. |
Formosa Heavy Industries Corp. |
H9701 Heater Fabrication |
2007 |
| Pan-America Hyperbarics, Inc. |
|
PHA-S1 Hyperbarics Oxygen Chamber Fabrication (32 set) |
2007 |
| Taiwan Fertilizer Co., Ltd. |
|
Niter III Process Heat Exchanger Fabrication |
2007 |
| LCY Chemical Industry Corp. |
|
Steel Structure Fabrication and Erection for Copper Sheet Plant |
2007 |
| Taiwan Prosperity Chemical Corp. |
|
310EA & 3301EC Tower Fabrication |
2007 |
| Pan-America Hyperbarics, Inc. |
|
PHA-S1 Hyperbarics Oxygen Chamber Fabrication (7 set) |
2006 |
| Formosa Petrochemical Corp. |
CTCI Corp. |
3F201~204 Heater Fabrication for #6 NC |
2006 |
| China Steel Corp. |
CTCI Corp. |
Phase IV CDQ Boiler installation |
2006 |
| Formosa Chemicals & Fiber Corp. |
CTCI Corp. |
DeNox Equipment Fabrication for AROMA-3 Heater |
2006 |
| Formosa Petrochemical Corp. |
CTCI Corp. |
OL-3 Cooling Tower Piping Work |
2006 |
| Nol-Tec System(ASIA) PTE, LTD. |
|
100 & 50 cu. Ft. Transporter Fabrication (CIF Singapore) |
2006 |
| Formosa Petrochemical Corp. |
|
Glass Tube Revamping for SAR E-6406 Sulfur Cooler |
2006 |
| LCY Chemical Industry Corp. |
|
Acrylonitrile Purification Equipment Fabrication |
2006 |
| China Steel Chemical Corp. |
|
Activated Clay Tower Fabrication |
2006 |
| Paul Wurth International S.A |
China Steel Machinery Corp. |
BF2 Granulation Tank & Hot water Tank Fabrication for China Steel Corp. |
2005 |
| Taiwan Power Company |
CTCI Corp. |
Equipment Fabrication for DeNox System for #4 Unit of Hsinta Power Plant |
2005 |
| Qatar Petroleum and Chemical Corp. |
CTCI Corp. |
EP2 Cracker Shell, Steel Structure, and Piping Fabrication/td> |
2005 |
| IHI Corp. |
CTCI Corp. |
Anchor Strap Prefabrication for LNG Storage Tank |
2005 |
| Orient Union Chemical Corp. |
|
E101C & E401A/B Heat Exchanger Fabrication |
2005 |
| Taiwan Prosperity Chemical Corp. |
|
3505VA Steel Structure, Granulator & Prill Tower Fabrication and Erection |
2005 |
| Taiwan Prosperity Chemical Corp. |
|
5108A Evaporator Fabrication |
2005 |
| China Steel Chemical Corp. |
|
E4101 & E4102 Heat Exchanger Fabrication |
2005 |
| Taiwan Power Company |
CTCI Corp. |
Equipment Fabrication for DeNox System for #3 Unit of Hsinta Power Plant |
2004 |
| The Babcock & Wilcox Company (B & W) |
CTCI Corp. |
DeNox Support Structure Fabrication for Campbell Power Plant-Unit 3 , Michigan, USA |
2004 |
| Anton Steinecker Maschinenfabrik Gmbh |
Holvrieka Ido B.V. , Netherlands |
Beer Brewing Tank Assembly and Installation for Tsingtao Brewery Co., Ltd. |
2004 |
| CPC Corp., Taiwan |
CTCI Corp. |
Heater, Boiler, Duct and Piping Fabrication and Erection for NP Project of Ta Lin Plant |
2003 |
| Formosa Chemicals & Fiber Corp. |
CTCI Corp. |
F201~F204 Heater Fabrication and Erection |
2003 |
| China American Petrochemical Co., Ltd |
CTCI Corp. |
Steel Structure for Storage Silos for #6 PTA Project |
2002 |
| The Babcock & Wilcox Company (B & W) |
CTCI Corp. |
SCR Support Structure Prefabrication for Karn Power Plant, Michigan, USA |
2002 |
| Taiwan Power Company |
CTCI Corp. |
SCR Steel Structure Fabrication for Taichung Power Plant Units 9 & 10 |
2002 |
| Babcock-Hitachi K.K |
CTCI Corp. |
HRSG Erection and Non-Pressure Parts Fabrication and Erection for Kuo Kuang Power Co., Ltd. |
2002 |
| The Babcock & Wilcox Company (B & W) |
CTCI Corp. |
SCR Reactor and Duct Fabrication for Lewis Creek Power Plant-Unit 1 & 2, Texas, USA |
2002 |
| The Babcock & Wilcox Company (B & W) |
CTCI Corp. |
SCR Support Structure Fabrication for Campbell Power Plant-Unit 2 , Michigan, USA |
2002 |
| CPC Corp., Taiwan |
CTCI Corp. |
Cracker Shell Fabrication and Erection for Alkylation Project of TOR |
2002 |
| Taiwan Power Company |
CTCI Corp. |
GGH Inlet Duct Steel Structure Fabrication for Taichung Power Plant Units 1~4 |
2001 |